300 kW Solar System Installation in Digboi, Assam at IOCL Digboi

The 300 kW solar system at IOCL Digboi displays the company’s commitment towards sustainability. It also highlights how industries use solar energy to reduce costs, increase productivity and support sustainability. The IOCL 300kW solar panel reduces company’s greenhouse gas emissions and enhances energy security while lowering operational costs.

The project faced challenges before and during the installation phase. These included environmental concerns, technical integration and diverse weather conditions. The project aims to fulfil IOCL’s energy needs and spread awareness about solar energy and its benefits.

solar rooftop assam

Project Overview: 300kW Solar Panel Installation

The establishment of IOCL Digboi dates back to 1901. It is one of the oldest refineries in India. IOCL found solar energy to be one of the viable renewable energies, being most accessible and easily installable within a given time. The project supports India’s sustainability goal to achieve net-zero emissions by 2070.

IOCL was also looking for a reliable source of consistent energy, which solar energy fulfils. With this 300kW solar panel installation at Digboi, Assam, IOCL has set a model for other industries to follow its strategy and adopt solar energy.

System Design and Installation: 300kW Solar Panel Cost

The project started with an energy load assessment for IOCL Digboi. The company authorities finalised a location with maximum sunlight exposure for the 300 kW solar plant. Both rooftop spaces and ground-level areas were examined to finalise the project site.

High-quality solar panels were chosen and set at an ideal angle to capture maximum sunlight. It was ensured that inverters that facilitate the conversion of DC electricity to AC were also of high quality.

Durable and sturdy mounting structures, on where the solar panels sit, were installed. It ensures they can withstand extreme climatic conditions and do not budge during strong winds. 

Project Benefits and Outcomes: Solar Companies in Assam

The 300 kW solar system project in Digboi has been beneficial in several ways. 

Environmental

Solar energy uses direct sunlight. It doesn’t use fossil fuels or other raw materials that emit poisonous gases and increase pollution. Solar energy thus reduces carbon footprint and supports sustainability.

Financial benefits

Solar energy is cheaper than conventional energy. Moreover, businesses can sell their surplus solar energy and reduce electricity bills.

Performance highlights

A 300kW solar panel plant provides continuous energy helping businesses to run their operations without any hindrance. Businesses become independent of external energy sources, as they have a stable energy source, which lasts for about 25 to 30 years.

Challenges and Solutions: 300kW Solar Panel Size

No big project can be completed without a challenge. The 300kW solar panel system at IOCL Digboi also faced several challenges. However, all were resolved with strategic solutions. 

Terrain

Challenge: Installing solar panels on varying topography of the 300 kW solar project at IOCL Digboi. Modular mounting systems were used making the installation flexible.

Solution: Additional civil work was carried out to ease the installation of solar panels

Weather

Challenge: Assam is cloudy and gets heavy rainfall and high humidity, which is bad for solar panel performance

Solution: Highly durable and anti-corrosion materials were used for mounting structures. Panels were set at an elevation to slide the water easily and not accumulate on them.

Grid Connectivity

Challenge: Demand mismatches and voltage fluctuation hampers gird connectivity.

Solution: Smart grid technology helps prevent these problems. Also, storing energy for any emergency can help mitigate the problem.

Technical challenges

Challenge: Installing solar plants on uneven terrain was difficult.

Solution: Innovation design strategies and specialised installation techniques were used to install the 300 kW solar plant at IOCL, Digboi.

Solar Panel Price in Assam

The IOCL Digboi 300 kW solar plant was successfully commissioned after overcoming several challenges. The project helps the company to reduce its operational costs, and electricity bills and provides continuous energy. The project also aligns with IOCL’s sustainability policies.

The project conveys a strong message that solar plants can be installed in any remote area, with uneven topography. 

Solar energy is the most viable renewable energy source and is easily accessible. It reduces the dependency on the conventional grid, which is a costly affair. Indian industries are adopting solar energy to help the government achieve sustainability goals.

Solar Rooftop Assam

Industries and businesses in Assam must adopt solar energy. The Indian government offers tax rebates to businesses switching to solar energy. The Assam State government offers subsidies to businesses for small projects.

It is essential to spread awareness of solar energy benefits, and how it helps to mitigate climate change. Policymakers and government agencies must aggressively spread awareness about solar energy.

Frequently Asked Questions



300kW solar panel cost in Assam ranges between Rs. 19 million to 23 million.

Under optimal conditions, a 300 kW solar panel generates about 1,200 kWh per day.

Continuous power supply, affordable energy, reduced electricity bills and support for sustainability are a few benefits of solar energy.

The government promotes solar rooftop policy in Assam to help people adopt solar energy with ease. You can apply online at daassam.org. Alternatively, Fryer Energy can help you through the entire solar energy adoption process, right from application to procuring subsidy.

Yes, provided you have adequate space and required permits.

300 kW solar panel price in Assam is about Rs. 28/- per watt.

2 to 4 weeks is enough to install a 300 kW solar system under normal conditions.

Cleaning the panels frequently, checking for cracks or damages and checking the inverter performance are a few maintenance tasks you can do on your own.

No, the subsidies are limited only to systems up to 3 kW.