Freyr Energy has covered over thousands of residential properties across India and made them go solar over the years. Our success story is attributed to our values and our unhindered approach to the solar panel installation process that we follow. If you are planning to migrate to solar, allow us to help you understand the step-by-step process of how we work and how we assist you all through the journey. Let us check out the process in depth.
How does Freyr Energy install solar panels?
Freyr Energy’s solar panel installation process comprises several steps that allow us to systematically assess and complete the project. We care for every small aspect and guarantee to provide the best quality products with our efficient services. With that being said, allow us to provide a step-by-step approach to how we design and commission a solar panel in your household:
1. Site Survey
Our first job in the solar panel installation process is conducting a feasibility analysis. In broader terms, a feasibility study or a site survey allows us to make a roadmap on the solar journey and give you the right assessment with the final price quotation.
There are several key factors such as checking the geographical locations of the residence, the amount of hindrances affecting any power generation, and more. Other factors include the area space required for installing the panels, the presence of adequate slope and direction of slope facing, and the length of other power transmission lines, etc.
We conduct an in-depth study of every single portion, thereby easing the process of site survey. Our interactive Freyr Energy Solar app allows you to remain steadfast with all the details and keep up with the step by step solar panel installation.
Our experts would request you about month-on electricity bills. This is crucial to assess your power requirements and the average consumption capacity. More so, it allows easier assessment of more of the panels that would suit your property.
Overall, a site survey is a comprehensive walkthrough of your power requirement that allows us to make a solid assessment.
2. Choosing the right panel
Now that you have the site survey done, the next step would be to choose the right panel that fits your requirements. At Freyr Energy, we host top-quality monocrystalline, polycrystalline, and bifacial panels. The productivity, efficacy, and warranty coverage vary from one panel to another.
In addition to the type of panels, there is also the number of panels and capacity constraints that come into play. Different homes have different power requirements. Therefore, not one single type of panel can cover all requirements.
3. Mounts and Inverter
The solar panel installation process involves the usage of mounts and inverters.
A mount is a device that holds the solar panel system afloat on the terraces/ rooftops in your house. In essence, a mount is a strong structure that would be able to withstand the panel mass and the roof, without crumbling down due to external influences. The location of installing the mount depends on the weather and other geographical conditions, which dictate the maximum exposure to sunlight throughout the day.
An inverter is a device that converts DC energy that’s absorbed in the panels to usable AC current that’s used in common residential uses. The quality and the type of inverters are based on the assessment conducted.
4. Reviewing proposal and confirmation of orders
Once every single aspect is conducted under the survey, we give you the final proposal that contains all the cost propositions and design specifications via the Freyr Energy App. This is the final step of the solar panel installation process as given by us before we move for commissioning.
We offer you financial options and assist you in getting the government subsidies once the commissioning is done. These factors alongside the comprehensive proposals make it a transparent procedure all through. You can check the entire journey through the app and even save the details in a secure cloud locker.
5. Commissioning and Tracking
Our team of experts will finalise the dates with you and conduct the solar installation process in your terrace/ open space. Every single step can be tracked using the tracker in the Freyr Energy app, which provides you with the time estimate it would take to install the panels and conclude the wiring setups and even net metering arrangements.
Once the procedure is complete, we will release and issue a work completion report, which is important for obtaining the subsidies from the government. Thus, this completes the solar panel installation process.
6. Round the clock support
Lastly, we provide round-the-clock support and warranty assurance to the panels we install. You can check the performance of the panels via the Freyr Solar App, which provides you with key metrics and a performance index. This allows you to care for and maintain the panels with ease. For further information, our service assurance is guaranteed.
7. Safety Measures
During the solar panel installation process, we take care of the earthing part as well. Earthing is a safety mechanism where electrical energy is safely disposed of underground using low-resistance wire. This ensures comprehensive protection from sudden voltage surges and intense lightning strikes.
At Freyr Energy, we ensure the electrical layout, wiring, voltage supply, and designs are compatible with one another and are carefully installed. This assures a complete solar panel installation process.
Why choose Freyr Energy?
At Freyr Energy, we follow systematic protocols and help streamline the solar panel installation process with ease. Our easy approach, backed with a smart AI app, allows you to get a transparent price quotation and service guaranteed while going solar.
Frequently Asked Questions
At Freyr Energy, we follow a detailed procedure for solar panel installation, which covers site survey, proposal submission, and finally commissioning.
It generally takes about 3–5 days to complete the process of solar panel installation.
We at Freyr Energy do the solar installation process with utmost care on earthing, wiring, setting up of cables and inverters, and finalising the right sized mount for the panels.
It normally takes hours to days, depending on several factors and constraints that matter in the solar energy installation process.
Solar rooftop installation process requires solar panels, mounts, inverters, and cables of different sizes and metres.