PM Surya Ghar Yojana 2025: How to apply online for Muft Bijli Yojana Details

The Government of India introduced PM Surya Ghat Muft Bijli Yojana scheme that would change the entire course of how an average Indian could consider going solar without hurting his/her finances. The scheme claims to cover a vast majority of the total expense required in setting up of a solar panel system in an Indian household.

Back before the scheme, there was a prominent hesitation amongst people, who felt the setting up of even 1 kW solar panel cost them a fortune. Now, with advanced technology and efficient panels to back the claim up with, the PM Surya Ghar Muft Bijli Yojana has transformed hopes for residents to go green with solar panels installed in their homes. 

This has prompted interests in over 1 crore Indian residents who have registered to avail the scheme in record time. There are plenty of new registrations amongst people who are opting for the solar yojana.

solar subsidy

Vision and Benefits of PM Surya Ghar Muft Bijli Yojana

PM Surya Ghar Muft Bijli Yojana bolsters the hope to shape the future of renewable energy generation in India. One of the aspiring PM solar schemes is to achieve the target of 280 gW generation of renewable power by 2030. What seems like a steep goal, has already seen India achieve 100 gW of solar panels installed as of Feb’ 2025. In addition to this, here are a few key factors how the scheme would play in assuring better economic movement:

 Required Documents for PM Surya Ghar Yojana Application 

Before you start your application, make sure you have clear, scanned copies or photographs of the following documents ready. These will be required for verification by the portal, DISCOM, and your selected vendor:

  1. Aadhaar Card – For identity and address verification.
  2. Latest Electricity Bill – To confirm your DISCOM registration and consumer details.
  3. Property Ownership Proof – Such as sale deed, property tax receipt, or mutation certificate, to prove the rooftop space belongs to you.
  4. Bank Account Details – Passbook or cancelled cheque to receive the subsidy amount directly in your account.
  5. Passport-sized Photograph – A recent photo for your application profile.

Explain Step-by-step process on Registering to PM Surya Ghar Muft Bijli Yojana

Now we would guide you the exact steps that you need to complete beforehand and ensure to have all the details ready. 

Eligibility:

The eligibility requirement includes you to:

Surya Ghar Muft Bijli Yojana Slab

Here is the slab of PM Surya Ghar Yojana in accordance to different capacity:

System CapacitySubsidy Amount
Up to 1 kW₹30,000
2 kW₹60,000
3 kW and above₹78,000 (maximum)

For residential society, the offer stands at INR 18,000 per kW upto 500 kW. This includes a maximum 3 kW per house and the upper limit being inclusive of individual rooftop plants by individual residents.

Final thoughts

PM Surya Ghar Muft Bijli Yojana has revived India’s hopes for going solar like never before. With over 1 crore people already showing interest, it won’t be far from the time where more people try and go solar with assistance from the Government.

Frequently Asked Questions



The PM Surya Ghar Muft Bijli Yojana is a Government of India initiative that provides financial subsidies to Indian citizens who are planning to install a solar power plant. This ensures to reduce the financial burden and initial costs of installing the panels.

Any Indian Citizen who has a property with a terrace space and has registered under the DISCOM of the state he/she resides.

Many vendors registered under government of India’s surya ghar yojana offer collateral free easy loans that can be availed for people who are looking forward to installing. The ROI of having such panels is usually around 4-5 years.

Visit the PM Surya Ghar Muft Bijli Yojana and register a profile under your mobile number. Fill in the details and check the registered vendors. Get necessity approvals and obtain a final commissioning report from the DISCOM, with which you can avail the subsidy.

Related Blogs

Disclaimer Policy | Privacy Policy | Sitemap

Copyright © 2025 Freyr Energy | All Rights Reserved.